Utes in NSW
At a glance
A used 2018 Ford Ranger ute, for sale in NSW.
Specifications
| Condition | Used |
|---|---|
| Year | 2018 |
| Make | Ford |
| Model | Ranger |
| Engine | 4 Cylinder |
| Odometer | 109,213 km |
| Body Type | Ute |
| Fuel Type | Diesel |
| Transmission | Sports Automatic |
| Location | NSW |
Price check
The asking price is 28% above the median asking price of $27,950.
That median is from 59 other Ford utes on Asset Scanner, built within two years of 2018.
From the dealer
***WE PROVIDE FINANCE AND RENT TO OWN OPTIONS*** Introducing the 2018 Ford Ranger PX MkIII MY19 Wildtrak Pick-up Double Cab, a robust and versatile 4x4 utility vehicle designed to meet the demands of both adventurous off-road enthusiasts and those seeking a reliable everyday workhorse. This Wildtrak variant, finished in a sleek white exterior, exudes a blend of rugged charm and modern sophistication, making it a standout choice in the competitive utility vehicle market. Under the hood, this Ranger is powered by a dynamic 2.0-liter twin-turbocharged diesel engine, delivering ample power and torque when you need it most. Its 4-cylinder configuration is complemented by a smooth 10-speed sports automatic transmission, ensuring you have the perfect balance of power and efficiency whether you're navigating city streets or tackling rugged terrains. With an impressive payload capacity of 954 kg, this Ranger is built to handle your toughest tasks with ease. The exterior is not only visually appealing but also designed for practicality and durability. The Wildtrak comes equipped with distinctive styling elements that set it apart, including bold front grille accents, eye-catching alloy wheels, and signature Wildtrak badging. Its robust construction and 4x4 capabilities make it ready for any adventure, while the double cab configuration provides ample space for passengers and gear. Step inside, and you'll be greeted by a thoughtfully designed interior that combines comfort with advanced technology. The spacious cabin can accommodate up to five passengers, making it ideal for family trips or transporting your crew. Premium materials and attention to detail are evident throughout, with features such as leather-accented seating, a multifunction steering wheel, and a user-friendly infotainment system equipped with navigation, smartphone integration, and premium audio. This Ford Ranger has been meticulously maintained and is in excellent condition, with an odometer reading of 109,213 kilometers. It comes with a clear title, ensuring peace of mind for its next owner. We offer a range of services to make your purchase as smooth as possible, including competitive finance options tailored to suit your needs, Australia-wide delivery for your convenience, and the opportunity to extend your warranty for added assurance. Our dealership operates strictly by appointment only, allowing us to provide personalized attention and ensure you have a dedicated time to explore this exceptional vehicle. We offer the opportunity for test drives to experience the Ford Ranger's performance firsthand. Additionally, we welcome trade-ins, providing a seamless transition to your new vehicle. For those seeking a reliable and capable utility vehicle that doesn't compromise on style or comfort, the 2018 Ford Ranger Wildtrak is a compelling choice. Contact us today to learn more about this remarkable vehicle and to arrange a private viewing appointment. We are a family run business and have been serving the Sydney area for many years. We hold over 140 pre owned vehicles in stock with a wide range of options and a price range between $3000 to $70,000 which caters to all clientele. We pride ourselves in only selling the best quality used cars at the most competitive prices possible. We take all precautions to ensure all our vehicles meet all legal and safety requirements with our extensive checks, which include: All vehicles are workshop checked All vehicles sold with current roadworthy certificate. All vehicles are PPSR checked All titles are clear and guaranteed. Further more we provide a range of extras to cater to our clients to make the experience that little more comfortable. They include: Same day fast, efficient and easy finance approvals with great rates available TAP. 1-5 Year Parts and Labour warranty including 24hr Roadside Assistance available on all vehicles. We can deliver anywhere in Australia at extremely competitive prices. We are open 7 days a week from 8:30am to 5:30pm, if you have any questions or would like to arrange an inspection/test drive. Yard 7 , 40 and 41 / 591 Carlisle Ave Minchinbury 2770 Regards, Kingz Motors Sales Team
Quick answers
The asking price is $35,888. It is listed by Kingz Motors in NSW. This is the dealer's asking price, so confirm the final price with the dealer.
This ute is listed in NSW. Inspections are arranged with the dealer, Kingz Motors.
Finance can be arranged through Equifund Financial Group, a related party of Asset Scanner. Equifund is a broker that compares options across 40+ lenders. No impact on your credit score to get a quote.
Similar listings
Picked by make, price, year and state.
Free price check
See what yours is worth with a free price guide based on 11,425 dealer listings. No sign‑up.
This listing and its details are supplied by the dealer. Asset Scanner does not own, sell or inspect this equipment and is not a party to any sale. Confirm the price, condition and availability with the dealer before you buy. Read the terms
Utes in NSW
2020
$36,990
Utes in NSW
2019 · 247k km
$21,990
Utes in WA
2018 · 46k km
$27,975
Utes in NSW
2017 · 199k km
$22,990
Utes in WA
2021 · 87k km
$29,975
Utes in WA
2021 · 124k km
$29,975
Utes in WA
2021 · 80k km
$34,975